The essentials before you specify
- Map the water exposure first. Groundwater, shower water, irrigation and rooftop rain create different selection problems.
- Buy a complete assembly. Include compatible primers, membranes, joint details, protection and drainage.
- Follow the waterproofing through every transition. A slab, wall, drain and pipe sleeve must connect into a continuous strategy.
- Plan inspection before concealment. Once concrete, paving or backfill covers the work, access becomes difficult.
A high-rise has several waterproofing environments stacked into one structure. A basement membrane may need to resist groundwater pressure; a bathroom system works beneath tiles; an exposed roof faces weather and maintenance traffic. Choosing all three from one generic “waterproofing” line in the bill of quantities leaves important decisions unresolved.
Use this map to prepare a coordinated package. Product families below are options for review, not interchangeable specifications. Final selection depends on the project design, local requirements and the current manufacturer-approved assembly.
Find your building zone
The building at a glance
| Zone | Exposure to consider | Assembly to review | Critical interface |
|---|---|---|---|
| Roof | Weather, UV exposure, rooftop equipment | Exposed or protected roof system | Parapets, outlets and equipment supports |
| Upper floors | Rain at terraces; water in wet rooms | Under-tile or exposed waterproofing as appropriate | Thresholds, drains and wall returns |
| Podium | Irrigation, landscaping and deck use | Protected waterproofing plus drainage | Planters, movement joints and outlet access |
| Basement | Groundwater and restricted repair access | Designed below-grade system | Raft-to-wall connection and service sleeves |
| Raft & pits | Water pressure beneath the structure | Pre-applied or other engineered tanking assembly | Pile heads, joints and pit transitions |
01 • Raft foundations & lift pits
Start below the building, where access after construction is limited. Establish the design groundwater conditions before choosing the barrier.
- Product families: purpose-designed pre-applied bonded sheet systems beneath the raft or against blindside construction; other engineered below-grade systems where the construction sequence allows.
- Detail priority: connect the raft barrier to basement walls, lift pits, pile heads and service entries.
- Selection question: is the proposed system supported for the design water pressure, substrate and concrete placement method?
- Coordination task: mark membrane continuity and joint locations on one drawing before reinforcement and concrete works begin.
Before concealment: Record condition, repaired damage and accepted joints before the next trade closes access.
Explore ibeam: waterproofing membranes. These links support product enquiries; confirm suitability for the specified assembly.
Technical reading: GCP: specifying below-grade waterproofing · GCP: pre-applied concrete bonding methods.
02 • Basement retaining walls
A retaining wall package needs both a water barrier and a plan for what happens outside it.
- Product families: approved post-applied sheet or liquid systems where the wall is accessible; pre-applied systems where access is restricted.
- Supporting layers: compatible protection boards and designed drainage layers. Check how collected water reaches a suitable outlet.
- Detail priority: carry the wall system into the raft connection and finish it with the specified top termination.
- Avoid a category mistake: drainage and protection products perform supporting roles; they do not replace the waterproofing barrier.
Before concealment: Accept the membrane, terminations and protection before backfilling. Include a check that drainage outlets remain usable.
Explore ibeam: bituminous protection boards and self-adhesive bituminous membranes. These links support product enquiries; confirm suitability for the specified assembly.
03 • Joints & penetrations
The joint schedule deserves its own waterproofing review. A construction joint and a movement joint should not automatically receive the same detail.
- Product families: cast-in waterstops, suitable swellable profiles, external joint bands and movement-capable sealing systems, selected for the joint type.
- Before ordering: identify movement, water exposure, required continuity and the method for joining intersections.
- At penetrations: coordinate sleeves, collars, flanges or other approved seals with the surrounding membrane.
- Site question: who checks waterstop positioning and connections before the concrete pour? Assign that inspection explicitly.
Before concealment: Photograph accepted joint assemblies and penetration details. Keep their locations traceable in the as-built record.
Explore ibeam: metal waterstoppers and polyurethane joint sealants. These links support product enquiries; confirm suitability for the specified assembly.
04 • Podiums & landscaped decks
A podium can combine paving, planting and occupied space below. Plan the full deck build-up before selecting individual layers.
- Product families: protected sheet or liquid-applied deck waterproofing, compatible protection, drainage and filter layers.
- For planting: confirm the root-resistance strategy and compatibility of the membrane, root barrier if needed, and drainage components.
- For circulation areas: assess imposed loads and the intended paving or traffic finish.
- Detail priority: planter walls, movement joints, outlets and changes in level. Keep maintenance access to drainage points.
- Procurement distinction: a geotextile may provide filtration or separation within a designed build-up; it is not the waterproof membrane.
Before concealment: Agree the inspection and testing sequence before protection, landscaping or paving hides the deck.
Explore ibeam: geotextiles and membrane protection boards. These links support product enquiries; confirm suitability for the specified assembly.
05 • Bathrooms & wet rooms
Bathrooms repeat across many floors, so a clear standard detail can improve consistency throughout the tower.
- Product families: under-tile sheet membranes, liquid membranes or cementitious waterproofing systems suited to the substrate and exposure.
- Complete the kit: compatible corner tapes, pipe collars, drain connections, tile adhesive and movement-joint sealants.
- Detail priority: floor-to-wall transitions, shower drains, thresholds and concealed pipe penetrations.
- Do not rely on the finish: tiles and grout alone do not form the waterproofing system.
Before concealment: Inspect transitions and complete the specified water test after the required curing period, before tiling.
Explore ibeam: wet-area waterproofing guidance. These links support product enquiries; confirm suitability for the specified assembly.
06 • Balconies & terraces
Balconies sit at the boundary between the building interior and outdoor weather. Their thresholds and outlets need early coordination.
- Product families: external under-tile waterproofing or an exposed trafficable system specifically suitable for the intended use.
- Design coordination: reconcile falls, door levels, membrane returns, drains and the final finish before setting out.
- Detail priority: balustrade fixings, slab edges and door interfaces. Resolve penetrations without leaving their sealing to the final trade.
- Ask the supplier: can the proposed assembly accommodate the substrate movement and outdoor exposure stated in the design?
Before concealment: Check the finished drainage route and threshold detail against the approved drawings; record any changes before covering.
Explore ibeam: PU waterproofing coatings. These links support product enquiries; confirm suitability for the specified assembly.
07 • Water tanks & service areas
Separate water-retaining structures from adjacent service floors. They may require different product approvals and exposure resistance.
- For drinking-water tanks: request product-specific evidence for the intended potable-water contact and confirm acceptance by the relevant project authority.
- Product families: suitable cementitious coatings, resin linings or sheet lining systems, with compatible joint and penetration details.
- Clarify service conditions: stored liquid, cleaning regime, immersion, substrate and repair access.
- For plant rooms: define expected leakage, drainage and any chemical exposure rather than assuming a tank lining is appropriate.
Before concealment: Review lining continuity, curing and the approved testing/commissioning procedure before the tank enters service.
Explore ibeam: waterproofing product range. These links support product enquiries; confirm suitability for the specified assembly.
08 • Roofs & plant decks
At roof level, distinguish exposed waterproofing from a membrane protected beneath other layers.
- Product families: specified bituminous, synthetic sheet or liquid-applied roof systems; select the complete assembly for its exposure.
- Exposure checks: UV, heat, wind uplift, maintenance access and the roof’s fire-performance requirements.
- Detail priority: parapets, outlets, overflow routes, pipe boots and rooftop equipment supports.
- Trade coordination: establish designated access routes and approved fixing details for MEP or solar equipment.
- Product check: determine whether the selected membrane needs a protective finish or topcoat. A generic chemistry name does not establish exposed-roof suitability.
Before concealment: Inspect seams or liquid-film records as applicable, accept all terminations, and complete the approved integrity check before handover.
Explore ibeam: APP bituminous membranes and PU waterproofing coatings. These links support product enquiries; confirm suitability for the specified assembly.
Turn the map into a procurement package
Use a separate schedule line for each zone and assembly. The following is a practical enquiry checklist, not a substitute for the project specification.
- Zone and exposure: location, substrate, water pressure or immersion, weather, movement and traffic.
- Approved build-up: membrane, primer, reinforcement, tapes, collars, waterstops, protection and drainage, including quantities for details.
- Current documents: product and system data sheets, safety information, relevant test evidence and project-required approvals.
- Compatibility: written confirmation for interfaces, adjacent materials and any proposed substitutions.
- Application requirements: substrate acceptance, moisture limits, preparation, curing, coat thickness or seam details as specified for that system.
- Supply plan: batches, shelf life, storage, phased delivery, accessory availability and installation support.
- Commercial comparison: compare the complete installed package and inspection obligations, not only the membrane price per square metre.
Related reading: how to verify waterproofing material quality before installation.
Four hold points worth putting in the programme
- 1. Before application: accept substrate preparation and resolve outstanding joints, cracks, penetrations and drainage details.
- 2. During installation: record batch details, application conditions and system-specific checks. Inspect representative details before repeating them floor after floor.
- 3. Before covering: complete the approved integrity-testing method. Flood testing is not automatically suitable for every assembly; confirm loading, curing and the test procedure with the design team.
- 4. At handover: supply as-built details, inspection records, repair history and maintenance instructions. Identify who must approve future penetrations.
Make these hold points visible in the inspection and test plan, with a named person responsible for release.
Frequently asked questions
Sometimes a product has several approved uses, but each zone still needs a supported assembly. Groundwater exposure, weathering, immersion, traffic and the final finish can change the requirements.
No. Thickness is one parameter. Review the system’s intended use, relevant performance evidence, joint detailing, substrate compatibility and installation controls. Use the thickness required by the approved system.
No. The waterproofing belongs within the complete wet-area assembly, including its drain and transition details. Schlüter’s shower waterproofing guidance explains why the tile covering alone is insufficient.
No. Its role is to manage water within a designed drainage arrangement. Select the water barrier separately and coordinate protection and drainage as parts of the overall assembly.
Do not assume so. Request evidence for the exact product’s intended drinking-water contact, service conditions and local acceptance. A general waterproofing claim does not establish suitability.
Use the approved project procedure and manufacturer’s requirements. The appropriate method, curing interval, duration and water depth depend on the assembly and structural constraints; there is no single value for every building zone.
Send the zone schedule, specification, drawings or typical details, quantities, intended application, delivery location and programme. List accessories as well as the main membrane so the enquiry covers the complete package.
Technical references
The linked manufacturer guidance supports the technical principles above. It does not establish UAE approval or availability of every example product. Use current local product documentation for selection.
- GCP: specifying below-grade waterproofing
- GCP: pre-applied concrete bonding methods
- Sika: drainage and protection layers
- Sika: waterstop systems
- Sika: plaza deck systems
- Sika: wet room systems
- Schlüter-Systems: tiled shower waterproofing
- Sika: exposed roof systems
- Sika: drinking-water treatment plants and reservoirs
Build your enquiry, zone by zone
Preparing a waterproofing package for a high-rise? Share your drawings, zone schedule and material requirements with ibeam to discuss product options and request a quotation.
- Include the specified assembly and any approved alternatives.
- Identify the accessories and protection layers you need.
- State quantities, delivery location and project timing.